About This Video
Every survey against the plan: how far, which way and how it is turning. The last survey projected to the bit, the plan ahead of it, every plan revision, and GeoEngine confirming the well is converging on plan. Rig and office see the same numbers.
The video uses sample data. Subtitles are in the player menu.
Read about DrillTracker →Transcript
Your last survey
Last survey, MD 3420.0. Bit
is behind the bit.
Every stand,
Sensor to bit: 15.0 m
are we on plan?
GeoMaster® DrillTracker
Every survey against the plan.
How far.
Dist to Plan: 2.75 m
Which way.
Left or right. Above or below.
1.74 m left of plan, 2.13 m above plan
How it's turning.
Tool Face 140.8° from high side
Build Rate 0.21 °/30m dropping, Turn Rate 0.17 °/30m right
Projected to the bit. Bit, MD 3435.0
Hold INC 86.57°, Trend INC 86.47°
Then ahead.
The plan ahead of it.
MD 3510.0, TF 180.0°, BR -0.20 °/30m
Plan changed?
Plan B takes over, MD 3060.0
Every revision.
Plan B (active)
Rig and office, one view.
Same numbers.
GeoEngine, /drilltracker: Converging on plan
4.00 m → 2.75 m, MD 3300.0 to 3420.0
Closing in, stand by stand.
Dist to Plan 4.00 m → 2.75 m
Go Geo, Master Everything
DrillTracker
GeoMaster




