Works With the Data You Already Have.
GeoMaster connects to your existing rig data infrastructure, no middleware, no rip-and-replace, no IT project. If your data speaks WITSML or LAS, GeoMaster speaks it too.
Data Standards
Every Major Format, Supported
WITSML 1.4.1.1
The most widely deployed rig data standard. Connect a server, browse its wells and wellbores, and pull trajectory, log and mudLog objects into a project on demand.
WITSML 2.1 / ETP 1.x
Support for the WITSML 2.1 object model and ETP streaming is in development.
LAS 2.0
Import wireline and LWD log files in LAS 2.0 format for offline analysis, post-well review, or retrospective geosteering interpretation.
OSDU
Planned integration with the OSDU data platform for enterprise operators who manage well data at scale across multiple basins and assets.
Rig & Mud Logging Systems
Works With Your Existing Stack
GeoMaster speaks WITSML 1.4.1.1 over SOAP. We have not yet certified named vendor servers, so contact us to confirm yours before you rely on it.
WITSML 1.4.1.1 server (SOAP)
SupportedAutomatic scheduled pulls
Coming SoonWITSML 2.1 / ETP server
Coming SoonFile Formats
Import & Export Formats
Format
Description
Status
LAS 2.0
Wireline and LWD log import
SupportedWITSML XML
Import of WITSML objects
SupportedCSV (Trajectory)
Comma-separated survey import
SupportedDLIS
Digital log interchange standard
Coming SoonSEG-Y
Seismic data: for LookAhead input
Coming SoonGetting Connected
From Credentials to Live Data in Under 10 Minutes
Enter Credentials
Provide your WITSML server endpoint and authentication. GeoMaster initiates outbound connections only, no firewall ports required on your side.
Select Data
Browse the wells and wellbores on your server and choose the trajectories, logs and mudlogs to pull.
Link to a Project
Pulled objects are linked to a project, with trajectories recalculated by minimum curvature. Pull again whenever you need fresh data.
Don't See Your System Listed?
We're actively expanding our integration library. If your rig uses a system not listed here, tell us; integrations are prioritised based on user demand. Many requests take less than two weeks to validate and ship.
Request an Integration →Connect Your First Rig in Under 10 Minutes.
Start your 14-day free trial, no credit card required. Or talk to our team about your specific rig setup.