Geosteering guide

What is geosteering?

Geosteering is steering a well while it is drilled, using the geology measured around the bit, so the wellbore stays inside the rock layer it is meant to produce from. This guide covers how it works, the data and methods behind it, and who does it.

Updated 17 November 2026 · GeoMaster technical team

Geosteering in one paragraph

Geosteering is the real-time adjustment of a well's path based on geological measurements taken while drilling. Instead of drilling to fixed coordinates from a pre-drill plan, the team compares logs from tools near the bit with a reference (type) well, works out where the wellbore sits within the target layer, and changes the trajectory to keep it there. It is used mostly in horizontal wells, where a layer only a few metres thick has to be followed for one to three kilometres.

Geosteering cross-sectionA vertical type well on the left, and a horizontal well that kicks off, builds angle, lands in a thin target layer and is steered along it, following the layer down across a small fault.faultupper shaletarget layerlower shaletype well (gamma ray)kick-off pointbuild (curve)landing pointlateral, steered to stay in zone
The horizontal well lands in the target layer and is steered to follow it. Across the fault the layer steps down, so the geosteerer calls a drop in angle to stay in zone.

Why wells need it

A pre-drill plan is built from seismic and offset wells. Seismic rarely resolves layers thinner than about 15 to 20 metres at reservoir depth, and the depth of a surface can be off by more than the thickness of the target. Layers also roll, thin and are cut by small faults that seismic cannot see. Drilling blind to the plan in that situation means a long lateral that spends much of its length in the shale above or below the reservoir.

The cost of leaving the zone is direct: lower production from that part of the well, extra sidetracks, more tortuosity that makes running casing and completing the well harder, and in some fields early water or gas. A published study of more than ten thousand steering decisions found that wells regularly spend a large share of the lateral out of target even with geosteering in place (see the JPT summary in the sources), which is why the method and the tools matter.

How geosteering works

The workflow repeats every survey station, typically every 30 metres or so of new hole, and in practice it looks like this:

  1. Prepare the model. Before the well, the geologist picks a type well, the formation tops and the target, and builds an expected structure along the planned path (dip, faults, thickness).
  2. Land the curve. In the build section the team watches the logs come into each marker above the target and adjusts the landing depth so the well enters the target at the right point and angle.
  3. Correlate in the lateral. Each new survey and log section is matched against the type well. The match tells the geosteerer the stratigraphic position of the well and the dip of the layers along the path.
  4. Make the steering call. From the position and dip, the geosteerer decides whether to hold, build or drop angle, and by how much, to stay in the best part of the layer.
  5. Execute and check. The directional driller carries out the call with the motor or rotary steerable system. The next survey and log confirm or correct the interpretation.

Two delays are built into this loop. The logging sensors sit some metres behind the bit, so the log describes rock the bit drilled a while ago. And a change of angle takes distance to achieve. Good geosteering anticipates both, using the projected bit position and the trend of the dip rather than only the last log value.

The data geosteerers use

  • Directional surveys: measured depth, inclination and azimuth at each station, converted to position with the minimum curvature method. Everything else is placed along this path. Our survey calculator and MD to TVD converter show the maths.
  • Gamma ray while drilling: the workhorse log. Shales read high and clean sands or carbonates read low, so the gamma ray pattern is what gets correlated. See reading a gamma ray log in a horizontal well.
  • Type well or offset wells: a vertical or near-vertical well through the same section, with logs and formation tops, used as the reference column. More on choosing one in our type well correlation guide.
  • Resistivity and density logs: help separate a shale from a tight streak and show fluid changes.
  • Azimuthal and image logs: readings around the borehole tell whether a boundary is being approached from above or below, and images give dip directly.
  • Deep directional resistivity: on higher-cost wells, these tools map boundaries several metres away from the wellbore, giving warning before the bit reaches them.
  • Mud logs, cuttings and drilling data: lithology from cuttings, gas readings, and rate of penetration often show a change before the log reaches it.

On most rigs this data reaches the geosteerer through a WITSML server. How that works is covered on our WITSML page.

Geosteering methods

Stratigraphic (correlation) geosteering

The horizontal well's log is plotted against true vertical thickness relative to a marker, so it can be laid directly beside the type well log. The geosteerer adjusts the dip of each segment of the interpretation until the two logs line up. This is the most common method in onshore horizontal wells and needs only a gamma ray log and surveys.

Model-based (forward-model) geosteering

A synthetic log is computed from the type well by carrying its values through the interpreted structure along the well path, then compared with the real log. Where they disagree, the structure (dip, faults, thickness) is changed until they match. It handles thickness changes and faults explicitly and gives a cross-section the drilling team can read.

Image and dip-based steering

Borehole images show bedding as sine waves; picking them gives the formation dip and its direction at the bit, which is then used to project the layers ahead.

Boundary mapping with deep resistivity

Inversions of deep directional resistivity place the upper and lower boundaries around the well in real time. Common offshore and in high-value wells; usually combined with one of the methods above.

In GeoMatch, GeoMaster's interpretation workspace, stratigraphic and forward-model correlation work on the same interpretation, so you can switch between them on one well.

A worked example

The geometry behind most steering calls is short. If the well is drilling at an angle δ relative to the bedding, it crosses a layer of true vertical thickness H in a measured length of about:

ΔMD = H / sin(δ)

Take a target 3 metres thick. If the well runs 1.5° steeper or shallower than the layer, it goes from the bottom of the zone to the top in 3 / sin(1.5°) ≈ 115 metres of hole: less than four survey stations. At 0.5° the same crossing takes about 344 metres. That is why small dip errors matter, and why the geosteerer keeps re-estimating dip rather than trusting the plan.

The dip seen along the well also depends on direction. Where the well azimuth differs from the dip direction by an angle φ, the apparent dip α along the well relates to the true dip β by:

tan(α) = tan(β) × cos(φ)

A layer dipping 4° in the direction of drilling shows the full 4°; drilled at 60° to the dip direction it shows about 2°. The apparent dip calculator does both directions of this conversion.

Who does the geosteering

The interpretation is done by a geosteering geologist (also called a geosteerer, or sometimes a geosteering engineer), working either at the wellsite or remotely. They work with the operator's operations geologist, who owns the target, and the directional driller, who executes the steering. Many operators use consultants or service companies for the geosteering itself. If you are looking at the role as a career, see what geosteering geologists earn.

Common pitfalls

  • Fault or facies change? A sudden change in gamma ray can be a small fault moving the well into a different layer, or the rock itself changing sideways. Steering on the wrong explanation drives the well out of zone.
  • Sensor-to-bit offset. The log describes rock behind the bit. At high penetration rates the bit can be past a boundary before the log shows it.
  • Over-fitting the correlation. Forcing every wiggle to match produces a structure with many small dip changes that is geologically unlikely. Fewer, longer segments usually steer better.
  • Losing the interpretation history. Decisions get revised as data arrives. Without a record of which interpretation each call was based on, the team cannot review what happened. GeoMaster keeps every interpretation as a version for this reason.

Geosteering software

Geosteering software brings surveys, logs, the type well and the interpretation together, and updates them as real-time data arrives. Desktop packages have long dominated; browser-based tools now let the rig and office work on the same live interpretation without installing anything. GeoMaster® is one of these: it covers correlation and modelling, tracking the well against its plan and an AI assistant that answers questions about the project. To compare options, read how to choose geosteering software, or see the product catalogue.

To learn geosteering step by step, start with the free training path and the geosteering glossary.

Frequently asked questions

What is geosteering in simple terms?+

Geosteering is adjusting the path of a well while it is being drilled, using measurements of the rock around the drill bit, so the well stays inside the layer of rock it is meant to produce from. It is most used in horizontal wells, where the target layer can be only a few metres thick.

What is the difference between geosteering and directional drilling?+

Directional drilling is the skill of making the well go where you point it: inclination, azimuth and dogleg, executed by the directional driller. Geosteering decides where it should point, from the geology seen while drilling. The geosteerer makes the steering call and the directional driller carries it out.

What data is used for geosteering?+

The core inputs are directional surveys, a gamma ray log measured while drilling, and an offset or type well to correlate against. Many wells add resistivity, azimuthal or image logs, deep directional resistivity, mud logs and cuttings descriptions, and drilling data such as rate of penetration.

What does TVT mean in geosteering?+

TVT is true vertical thickness: the thickness of a layer measured vertically. Plotting the horizontal well log against stratigraphic position (TVT relative to a marker) lets the geosteerer compare it directly with a vertical type well and see where in the layer the well is.

Is geosteering done on the rig or remotely?+

Both. Many operators now geosteer from an office or remote operations centre with real-time data streamed from the rig, while others keep a wellsite geologist on location. The workflow is the same; what changes is how the steering call reaches the directional driller.

Can geosteering be automated?+

Parts of it can be assisted: correlation suggestions, dip estimates and alerts when the log stops matching. The final steering decision still sits with a geologist in most operations, because ambiguous log responses (a fault, a facies change, a thinning bed) need judgement and accountability.

Sources

Steer your next well in the browser

GeoMaster® puts log correlation, the geological model and plan tracking in one browser tab. Start on the free plan, or ask for a 14-day Pro trial: we approve requests within 1 working day.