Geosteering guide

Geosteering glossary

36 terms you will hear on a steering call or read in a well report, defined in plain language.

Updated 17 November 2026 · GeoMaster technical team

New to the subject? Start with what geosteering is, then come back here when a term is unfamiliar.

A to Z

Apparent dip

The dip of a layer measured along the direction the well is drilled. It equals the true dip only when the well is drilled straight down-dip or up-dip; at an angle to the dip direction it is smaller. Geosteering works with apparent dip along the well's vertical section.

Azimuth

The compass direction of the wellbore, in degrees from north (0 to 360). Measured at every survey station together with inclination.

Build rate

How quickly inclination increases, usually in degrees per 30 m or per 100 ft. It sets how fast the well can respond to a steering call.

Curve (build section)

The part of a horizontal well where inclination builds from the kick-off point to roughly horizontal, ending at the landing point.

Deep directional resistivity

An LWD measurement that senses resistivity contrasts several metres away from the wellbore, so boundaries above or below the well can be seen before the bit reaches them.

Dip

The angle of a layer from horizontal. In geosteering it is often given in degrees "up" or "down" relative to the direction of drilling.

Directional driller

The specialist who controls the trajectory with the motor or rotary steerable system, turning steering calls into slide and rotate settings.

Dogleg severity (DLS)

The total change in wellbore angle between two surveys, normalised to degrees per 30 m or 100 ft. Every steering correction adds dogleg, which is limited for casing and completion. Dogleg severity calculator.

Fault

A break in the rock where layers on one side have moved relative to the other. Crossing a fault can shift the well suddenly to a different stratigraphic position.

Forward model

A synthetic log predicted for the planned or actual well path from the type well and a structural model. Matching it to the real log is how position and dip are checked.

Gamma ray (GR)

A log of natural radioactivity, usually high in shales and low in clean sands and carbonates. The most common correlation log in geosteering.

Inclination

The angle of the wellbore from vertical. 0° is vertical; 90° is horizontal. Above 90° the well is drilling upwards.

Kick-off point (KOP)

The depth where the well starts to deviate from vertical.

Landing point

The point where the curve enters the target layer at close to the planned inclination. Landing well is one of the main jobs of geosteering.

Lateral

The near-horizontal section of the well drilled along the target layer after landing.

LAS file

Log ASCII Standard, a plain-text format for well log curves. The most common way logs are exchanged between companies and software. Free LAS viewer.

LWD

Logging while drilling: logging tools in the bottom-hole assembly that measure formation properties while the well is drilled.

Marker

A distinctive log feature, such as a shale spike or a sharp step, that can be recognised in both the type well and the drilled well and is used to tie them together.

Measured depth (MD)

Depth along the wellbore from the reference point, as drilled. In a horizontal well MD keeps increasing while TVD barely changes.

Minimum curvature

The standard method for calculating the well path between survey stations, assuming a smooth circular arc between them. Survey calculator.

MWD

Measurement while drilling: downhole tools that measure inclination, azimuth and toolface and send them to surface, usually by mud pulse.

Offset well

A nearby existing well used to predict the geology of the new well. The best one for correlation becomes the type well.

Rotary steerable system (RSS)

A downhole tool that steers while the drill string rotates, giving smoother hole and finer corrections than sliding with a mud motor.

Sensor offset (bit-to-sensor distance)

The distance between the bit and a measurement sensor. The log describes rock drilled some distance back, so the geosteerer projects the bit position ahead.

Sliding

Drilling with a steerable motor without rotating the string, the bend pointed at a chosen toolface, to change the direction of the well.

Steering call

The instruction from the geosteerer to the directional driller: a target position or inclination, with the interpretation it is based on.

Stratigraphic position

Where the well is within the layered sequence, for example "1.5 m below the top of the target". The main output of a geosteering interpretation.

Survey

A measurement of inclination and azimuth at a measured depth, taken typically every 30 m or one stand. The well path is calculated from the surveys.

Target window

The interval within the reservoir where the well should stay, set by the subsurface team. Often a few metres thick, sometimes less than one.

Toolface

The direction the bend in a motor (or the steering force in an RSS) points around the wellbore, which sets the direction a slide will push the well.

True stratigraphic thickness (TST)

The thickness of a layer measured perpendicular to its bedding. It differs from TVT when layers dip.

True vertical depth (TVD)

Vertical depth below the reference point, independent of the well path.

True vertical thickness (TVT)

The vertical thickness of a layer at a location. Geosteering correlation often works in TVT space, flattening the type well and drilled well to the same reference.

Type well

The reference well whose log sequence is used to recognise markers in the drilled well. Choosing a good type well is the first step of any geosteering job.

Vertical section (VS)

The horizontal distance of the well projected onto a chosen azimuth, usually the plan direction. Geosteering cross-sections plot TVD against vertical section.

WITSML

Wellsite Information Transfer Standard Markup Language, the industry standard for streaming real-time surveys and logs from the rig to remote users and software.

Steer your next well in the browser

GeoMaster® puts log correlation, the geological model and plan tracking in one browser tab. Start on the free plan, or ask for a 14-day Pro trial: we approve requests within 1 working day.