Everything Happening at the Bit. One Screen.
DrillTracker is GeoMaster's real-time operational dashboard — combining drilling parameters, geological interpretation, and plan vs actual tracking in a single configurable workspace.
Available on Basic plan and above.
Live Parameters
Everything Your Team Needs to See
Nine parameter groups displayed live — all updatable on every WITSML pull.
Bit Depth & Progress
Real-time measured depth, TVD, and progress against planned total depth.
Rate of Penetration
Instantaneous and averaged ROP, colour-coded against prognosis thresholds.
Weight on Bit
WOB trending live — flag overpull or understeer before it affects the formation.
Torque & Drag
Surface and downhole torque, drag during trips, and friction factor calculations.
Standpipe Pressure
SPP trending with configurable high/low alerts for pump efficiency and ECD monitoring.
Equivalent Circulating Density
Calculated ECD at TD — critical for managed pressure drilling and wellbore stability.
Mud Weight & Temperature
Mud weight in/out, returns temperature, and rheology parameters from the mud logging unit.
Gas Readings
Total gas and individual component readings (C1–C5) with background and connection gas comparison.
Formation Tops
Prognosis tops overlaid against actual penetration — deviation flagged automatically.
Role-Based Views
Preconfigured for Every Person on the Team
Three views come ready out of the box. Each is fully customisable — your layout, your data.
Geoscientist View
- ✓Geological interpretation overlay on depth track
- ✓Formation tops — prognosis vs actual
- ✓LWD curve display (GR, resistivity, density, neutron)
- ✓GeoEngine™ anomaly alerts inline
- ✓Stratigraphic correlation panel
DDO View
- ✓Inclination, azimuth, and toolface
- ✓Dogleg severity (DLS) trending
- ✓Plan vs actual trajectory deviation
- ✓Slide/rotate footage tracker
- ✓Motor yield and BHA performance
Mud Logger View
- ✓Full mud parameter suite
- ✓Total gas and chromatograph readings
- ✓Lithology log and cuttings description entry
- ✓ROP vs depth track
- ✓Connection gas and background gas comparison
Plan vs Actual
Know the Moment You Deviate from Prognosis.
DrillTracker overlays your planned trajectory against the actual well path in real time. Deviation from prognosis is flagged the moment it exceeds your defined tolerance — in depth, inclination, or azimuth.
- ✓Planned vs actual trajectory overlay on 2D cross-section
- ✓Formation top prognosis vs actual penetration depth
- ✓Target window entry and exit tracking
- ✓Deviation alerts configurable per parameter
Alerts & Thresholds
Get Notified Before It Becomes a Problem
Configurable Parameter Alerts
Set minimum and maximum thresholds for any drilling parameter — ROP, WOB, torque, SPP, ECD, mud weight, gas readings, or any WITSML channel. Alerts trigger in-app immediately.
GeoEngine™ Anomaly Flags
AI-detected anomalies surface directly in DrillTracker as inline alerts — no need to switch to a separate GeoEngine tab. The reasoning is shown alongside the flag.
Notification Options
In-app notifications are available on all plans. Email notifications for high-priority alerts are available on Basic and above. SMS and webhook integrations on Enterprise.
Enterprise
Running Multiple Wells? See Them All.
The Enterprise multi-well overview puts all your active wells on a single dashboard — real-time parameters, active alerts, and GeoEngine™ status side by side. Ideal for operations centres managing pad drilling or multi-basin campaigns.
Automated Reporting
Daily Reports in One Click.
DrillTracker auto-populates daily drilling reports and end-of-well summaries from your live data. No copy-pasting. No manual curve lookups. GeoEngine™ can draft the narrative sections in plain English.
- ✓One-click daily drilling report — PDF export
- ✓End-of-well summary with full parameter log
- ✓Client-ready formatting, customisable header/footer
- ✓GeoEngine™ narrative summaries of the day's key events
- ✓Automated delivery by email on Enterprise
Daily Drilling Report
Well 15/9-F-11 · 25 May 2026
Start depth (MD)
3,210 m
End depth (MD)
3,384 m
Progress
174 m drilled
Avg ROP
14.5 m/hr
Formation
Upper Brent (on prognosis)
GeoEngine alerts
2 (reviewed)
DrillTracker FAQ
Answers for the people who'll actually use it.
See DrillTracker on a Live Well.
Available on Basic plan and above. Start your 14-day free trial or book a live demo on a well from your basin.