If you are new to the subject, start with what geosteering is. This page is about how it runs on a drilling well, day and night, alongside the drilling crew.
Who is involved
- Geosteering geologist: interprets surveys and logs against the type well and recommends where the well should go. Often a consultant, working at the wellsite or remotely. See the geosteering geologist.
- Operations geologist: the operator's owner of the target and the geological prognosis. Approves changes of target.
- Directional driller: plans and executes the trajectory with the motor or rotary steerable system: slide or rotate, toolface, build and turn rates.
- MWD/LWD engineer: runs the downhole measurement tools and gets surveys and logs to surface.
- Drilling supervisor and drilling engineer: own the well as a whole, including dogleg limits, hole condition and casing.
- Mudlogger or wellsite geologist: cuttings, gas and lithology at the rig, often the first to see a change.
The steering loop
Every survey station runs the same short loop:
- A new survey and a new stretch of log arrive, usually through a WITSML server.
- The geosteerer extends the interpretation: where is the well in the layer, and what is the dip here?
- They project the bit position ahead of the sensor and ahead of the last survey.
- If the well needs to move, they issue a steering call; otherwise the instruction is to hold.
- The directional driller converts the call into slide or steering settings and drills on.
The loop is limited by two lags. The logging sensors trail the bit, so the newest log describes rock drilled some time ago. And any change in angle takes distance: at a build rate of 3° per 30 metres, changing inclination by 1.5° takes about 15 metres of hole.
What a steering call looks like
A good call is short and testable. It usually gives a target position and the angle to hold, for example: "We are 1.2 m below the top of the zone and the dip is 1.5° down. Drop to 91.0° inclination over the next stand and hold, aim to be 1.5 m below the top by 3,450 m MD." It states the interpretation it is based on, so if the next survey disagrees, everyone can see why the plan changes.
Calls are often expressed against the well plan as a corridor: stay within so many metres above or below the planned line, or within a stratigraphic window. DrillTracker shows the actual path against the active plan, the distance to plan and the steering still required, so the directional driller and the geosteerer read the same numbers.
Landing the curve
Landing is often the hardest part of the well. The build section drills down through the markers above the target, and each marker arriving earlier or later than expected moves the predicted target depth. The geosteerer updates the landing point marker by marker, and the directional driller adjusts the build rate to enter the target at the planned inclination. Landing too low or too steep wastes lateral length; landing too high risks a long stretch in the overlying shale. There is a full guide with a worked example on landing the curve.
Drilling the lateral
In the lateral the work becomes correlation and dip tracking. Small dip changes are common, and faults can move the well suddenly into another layer. Typical decisions:
- Hold: the well is in the preferred part of the layer and the dip is stable.
- Small correction: the dip has changed by a fraction of a degree; adjust inclination to stay parallel.
- Recover: the well has drifted towards a boundary; steer back with the least dogleg that gets it there before it exits.
- Re-interpret: the log no longer matches anything; consider a fault or a facies change before steering hard on it.
A worked example of how quickly a small angle error takes a well out of a thin layer is on the main guide.
Motors and rotary steerable systems
With a steerable mud motor, the driller changes direction by sliding: stopping drill-string rotation and drilling with the bend in the motor pointed at the chosen toolface. Sliding is slower and makes the borehole less smooth, so steering calls are timed to keep slides short. A rotary steerable system steers while the string rotates, allowing smaller and more frequent corrections and a smoother hole. The geology is the same either way, but the tool decides how fine the steering can be.
Every correction adds dogleg. The drilling engineer sets dogleg severity limits for casing, completion and the life of the well; the dogleg severity calculator shows how a set of surveys measures up.
Geosteering vs directional drilling
| Directional drilling | Geosteering | |
|---|---|---|
| Question it answers | How do we make the well go there? | Where should the well go? |
| Reference | The well plan: coordinates, inclination, azimuth | The geology: type well, markers, the target layer |
| Main data | Surveys, toolface, drilling parameters | Surveys, gamma ray and other logs, cuttings |
| Who | Directional driller | Geosteering geologist |
| Output | Slide and rotate settings, a drilled trajectory | An interpretation and a steering call |
The two are complementary: geosteering without a capable directional driller cannot hit the call, and directional drilling without geosteering hits the plan even when the plan is in the wrong rock. There is a longer comparison on our blog: geosteering vs directional drilling.
Turning a steering call into a new drillable plan from the bit is what LookAhead is for; it is in early access.
Frequently asked questions
What is geosteering drilling?+
Geosteering drilling is directional drilling where the target is set by the geology seen while drilling rather than only by fixed coordinates. The geosteerer interprets logs and surveys to place the well in the target layer, and the directional driller adjusts the trajectory to follow those calls.
Who makes the steering decision?+
The geosteering geologist recommends where the well should go, usually as a target position or inclination window. The operator's operations geologist or drilling supervisor approves it, and the directional driller decides how to drill it with the tools in the hole.
How often are steering calls made?+
The interpretation is updated at every survey, typically every 30 metres or so in the lateral. A change of instruction is only given when the position or the dip estimate moves enough to matter; many stations end with "hold as you are".
Why does sensor-to-bit distance matter?+
The logging sensors sit behind the bit, often by 10 metres or more. The log therefore describes rock the bit has already passed. The geosteerer projects the bit position ahead of the last survey and steers for where the bit is, not where the sensor is.
Does geosteering slow drilling down?+
It should not. Steering calls are made while drilling continues. Poor geosteering slows wells down indirectly, through sidetracks, extra sliding to correct late, and wellbore tortuosity that makes running casing harder.