The Culzean Field, Block 22/25a, UK North Sea
2020, Geological Society, London, Memoirs · author 2 of 4 · doi.org/10.1144/m52-2019-26 · Cite
Culzean · Setting
Between the Lomond Deep and the Heron Cluster in the Central North Sea. A high-pressure, high-temperature field at 936 bar and 176°C, holding lean gas condensate in Triassic Skagerrak and Jurassic Pentland sands.
Culzean · Key figure
Initial pressure: 936 bar (13,575 psi)
Culzean · Key figure
Temperature: 176°C (348°F)
Culzean · Key figure
Recovery: Up to 300 million barrels of oil equivalent; plateau around 100,000 boe a day
Culzean · History
Discovered in 2008 by well 22/25a-9Z, drilled on a tilted fault block. Appraisal wells 22/25a-10, 10Z, 10Y and 11 followed.
Culzean · History
Sanctioned in 2015, production started in mid 2019 from six wells on a wellhead platform. Gas goes to shore through the CATS pipeline; condensate goes to the FSO Ailsa.
Culzean · Where wells do best
The primary reservoir is the Joanne Sandstone Member of the Skagerrak Formation, with a secondary reservoir in the Pentland Formation.
Culzean · Hazards
High pressure and high temperature: 936 bar and 176°C at the start.