The story
- Akpo was discovered in 2000, one of the deepwater successes that followed Bonga and Agbami.[1, 2]
- Production started in March 2009, ahead of plan, through a floating vessel that can process 185,000 barrels a day and store 2 million barrels.[1]
- Of up to 530 million cubic feet of gas a day, 185 million are injected back into the reservoir and 320 million exported to the Amenam hub for the domestic market and Nigeria LNG.[1]
Geology
Geological setting
Published interpretationA quiet zone of isolated large detachment folds between an inner belt of thrusted shale diapirs and an outer belt of stacked thrusts, shaped in several stages by ductile shale flow.[3]
The trap
Published interpretationA structure grown by flowing shale. Structures around it closed near the end of the Middle Miocene, but Akpo did not form its own closure until the Pliocene, and it keeps growing as the synclines beside it migrate away from its core.[3]
Reservoir rocks
Reported- Agbada Formation
The sand and shale of the Niger Delta proper, laid down from the Eocene to today and the main oil and gas reservoir of the delta.
Source rock
Published interpretationCharge modelling suggests oil and gas began moving into nearby structures in the late Miocene; by the time Akpo closed, the deep kitchens around it were mature for mostly gas.[3]
What a well drills through
The main rock layers above and in the reservoir, top down. Tap a layer for a summary.
- Sandstone
- Mudstone and shale
Drilling
Where wells do best
Published interpretation- The structures around Akpo that formed earlier, in the Middle Miocene, may hold more oil than Akpo itself.[3]
What to watch for
Published interpretation- The development uses 110 km of high-pressure, high-temperature subsea flowlines.[1]