Oil and gas field · Northern North Sea
Brent field
The first discovery in the northern North Sea and one of the largest in UK waters. Oil and gas in two reservoirs: the Brent Group and the Statfjord Formation.
Block 211/29, about 100 miles north-east of Shetland and 300 miles NNE of Aberdeen.
Field record
- Status
- Production ceased
- Discovered
- July 1971
- Discovery well
- 211/29-1
- First production
- November 1976
- Water depth
- 142 m
- Original operator
- Shell
- Operator
- Shell plc
North Sea Transition Authority open data[1]
Oil and condensate in place
3.8 billion stock tank barrels[2]
Expected recovery
1,988 million barrels of oil and condensate, 6,000 billion cubic feet of gas[2]
Wells to 2000
220 platform and 3 subsea wells[2]
The story
- Discovered in 1971 and developed from four fixed platforms, Alpha to Delta, installed between 1975 and 1978. Production began in 1976. The Shell and Esso fields were named after water birds; Brent is the Brent goose.[1, 3]
- In 1992 the partners decided to depressurise the field to recover an extra 1.5 trillion cubic feet of gas and 34 million barrels of oil. Water injection stopped in January 1998 and depressurisation began.[2]
- The regulator now lists the field as production ceased.[1]
What a well drills through
The main rock layers above and in the reservoir, top down. Tap a layer for a summary.
- Mudstone and shale
- Limestone and marl
- Sandstone
- Organic-rich mudstone (source rock)
- Coal
The trap
A westerly dipping tilted fault block, sealed where the reservoirs are cut off at an unconformity. The oil area is about 10 miles north to south and 3 miles east to west.[3]
Reservoir rocks
- Brent Group
The Middle Jurassic delta sands that made the northern North Sea: the reservoir of Brent, Ninian, Thistle, Dunlin and Alwyn North.
- Statfjord Formation
Latest Triassic to Early Jurassic sandstones laid down by rivers and fan deltas. The deeper of the two reservoirs at Brent and Alwyn North.
Where wells do best
- Seven reservoir units: four cycles in the Brent Group and three in the Statfjord Formation. Two east-west faults split the field into three production areas.[3]
- The faulted crest, with slumped blocks under reworked sediment, held about 5% of recoverable reserves and was developed late, helped by 3D seismic shot in 1995.[2, 3]
What to watch for
- The crest is cut by faults into down-faulted slump blocks, which makes it complex to drill and map.[3]
GeoEngine Field Intelligence
This page, inside your geosteering project
Field Intelligence in GeoEngine writes a cited report on the field your well is in: the formations, how they read on logs, where wells do best and what can go wrong. Next, those reports will start from the Atlas entry for your field.
See Field IntelligenceSources
Written in our own words from these sources. Checked 17 November 2026.
- 1UKCS offshore hydrocarbon fields (WGS84): discovery date and well, first production, water depth, operators. North Sea Transition Authority Open Data.
- 2Taylor, Almond, Arnott, Kemshell and Taylor (2003), The Brent Field, Block 211/29, UK North Sea. Geological Society, London, Memoirs 20, 233 to 250.
- 3Struijk and Green (1991), The Brent Field, Block 211/29, UK North Sea. Geological Society, London, Memoirs 14, 63 to 72.
- 4FGDC Digital Cartographic Standard for Geologic Map Symbolization (FGDC-STD-013-2006), section 37: lithologic patterns. U.S. Geological Survey Techniques and Methods 11-A2.