J. Almond

5 statements in the GeoMaster® Atlas rest on a paper by J. Almond. Each one is written in our own words, so we list them all here for anyone to check.

The Brent Field, Block 211/29, UK North Sea

2003, Geological Society, London, Memoirs · author 2 of 5 · doi.org/10.1144/gsl.mem.2003.020.01.20 · Cite

  • Brent · Key figure

    Oil and condensate in place: 3.8 billion stock tank barrels

  • Brent · Key figure

    Expected recovery: 1,988 million barrels of oil and condensate, 6,000 billion cubic feet of gas

  • Brent · Key figure

    Wells to 2000: 220 platform and 3 subsea wells

  • Brent · History

    In 1992 the partners decided to depressurise the field to recover an extra 1.5 trillion cubic feet of gas and 34 million barrels of oil. Water injection stopped in January 1998 and depressurisation began.

  • Brent · Where wells do best

    The faulted crest, with slumped blocks under reworked sediment, held about 5% of recoverable reserves and was developed late, helped by 3D seismic shot in 1995.