Williston Basin: An Analysis of Salt Drilling Techniques for Brine-Based Drilling Fluid Systems
1988, SPE Drilling Engineering · author 1 of 2 · doi.org/10.2118/15152-pa · Cite
Bakken and Three Forks · Hazards
Salt at 5,000 to 12,500 ft has collapsed casing across the basin: flowing salt loads casing where washed-out hole was poorly cemented. Keeping drilling-fluid flow laminar limits the washout.